Galileo Pavilion
Students returned from a short winter break, and work began on site with excavation and the removal of concrete footings from the existing sculpture and plinth wall. By the end of the week the site was cleared, the building layout was marked and excavation of the crawl space was underway. At the same time, work continued off-site with further development of the design, construction documents, budget, and coordination with several members of the JCCC community.