3716 Springfield
The completion of hanging all of the drywall was impeded by our temporary floor deck over the double height space. This was originally built for ease of access to the upper west side, but we reached the point where it was more of a hindrance and needed to take it down. It was another one of those big steps in the building’s aesthetic to see the loft for the first time.