For the large expanse of glass, as well as the structure of the house, a steel H-frame was specified on the west side of the building.  We spent a great deal of time in detailing the exact location of its placement and installing the necessary hardware for it to be received.  On Friday, each piece was boomed into place and assembled together on site.  Its placement allowed us to put up the rest of the building’s wood frame walls. 

 