PREFAB PROGRESS : |
week 14 [march 31 - april 6] |
| weekly progress | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 |
During week fourteen, we were able to completely seal the building. With the arrival of the doors and windows, we now have a watertight structure. The Tavern Creek Loewen Window Center delivered three sets of sliding glass doors, two terrace doors, and one French terrace door. The installation required eight people to lift and place the doors and windows in their accurate places. After ensuring the nailing flange was level, square, and plumb, we insulated and flashed the sides of the doors to complete the seal. Finally, we applied Sikkens’s Natural Light wood finish to match the exterior siding finish. |
|
![]() |
![]() |
![]() |
||
| Backfilling around the Collar | Preparing for Retaining Wall | Installing Loewen Sliding Glass Doors |
||